Our Facilities
· Transformer Plant
·
· Vacuum Circuit Plant
·
   
 
             
 
Switchgear Assembly Area
Wiring of Components


Routine quality checks are conducted at various stages of the manufacturing processes. In addition, standard tests are performed before authorizations are given for transfer-to-stock as well as release-from-stock.

Switchgears undergoing QA checks
Switchgear undergoing injection tests
Switchgears undergoing high-voltage tests

Tests specialists are equipped with good knowledge of electrical testing techniques and various international standards and design philosophies. Only with a strong foundation in electrical applications can faults be detected and analyzed correctly and effective remedial actions take place.

Bus Bar Shop
 
Developed by Global Network Unlimited Pte Ltd. Copyright © 2006 - 2007. All Rights Reserved