About Us
· Corporate Profile
· Milestones
· Career
· Links
  Meidensha
  Meiden Indonesia
   
 
             
 

1975   Establishment of Meiden Singapore Pte Ltd by Meidensha Corporation of Japan.
1979   Establishment of Distribution Transformer plant.
1995   Awarded ISO9001 and JQA.
1997   Installation of 2 x 400kV, 720MVA Generator Transformers at Tuas Power Station, Singapore.
1998   Establishment of 36kV capacity Switchgear/Circuit Breaker plant.
2000   Successful turnkey completion of traction and high-voltage power supply system for Changi Airport MRT Line.
2001   Installation of 2 x 60MVA Generator Power Transformers in Salvador, Brazil.
2002   15,000th Distribution Transformer delivered.
2003   Establishment of manufacturing facility for 420kV capacity Switchgear Control and Protection Panel.
2003   5000th Distribution Switchgear delivered.
2004   Establishment of Meiden Power Solutions (S) Pte Ltd focusing on power electronics equipment and power quality solutions.
2004   Establishment of Meiden Asia Regional HQ.
2004   Successful turnkey completion of traction and high-voltage power supply system for Manila MRT Line 2.
2006   Establishment of 154kV, 100MVA capacity Power Transformer plant.
2006   Establishment of manufacturing facility for Automatic-Voltage-Regulator Panel for 154kV capacity Power Transformer.
2007   Successful turnkey completion of 230kV/230kV, 500MVA Phase-Shift-Transformer and 230kV GIS at Tampines Wafer substation, Singapore.
 
 
Developed by Global Network Unlimited Pte Ltd. Copyright © 2006 - 2007. All Rights Reserved